Flare Tip Wind Shroud Replacement - CKP Platform, Malaysia

The safe and cost-efficient solution to your lifting challenge.

Carigali Hess inspected the flare system on the CKP Platform of the Cakerawala Gas Field. They concluded that the wind shrouds of the installed flare tips needed replacement. Conbit’s unique lifting expertise and extensive flare works experience paved the way for Carigali Hess to award the contract to them.

Watch how we prepare and execute

Watch how we prepare and execute

Modular lifting system at the top of the flare tip platform

Flare burner wind shroud replacement 

The project included the replacement of two wind shrouds weighing 250 kg each and repairing and reinforcing one wind shroud weighing 800 kg. The team also performed some flare tip maintenance activities.

Temporary lifting equipment 

Conbit applied one of its own temporary modular lifting solutions for this project, providing the following equipment: 

• Lightweight lift booms (Conbit SL340 – 4m and Conbit SL340 – 6m)

• Lift winch and a service winch 

• Full set of certified rigging materials and spare materials

• Welding equipment

The crew consisted of 6 people, including a team leader, rope access (IRATA level 3 & 1) technicians, and two welders. CR Asia was part of the offshore crew.

The power of preparation 

Conbit delivered the lifting engineering, crew, and lifting equipment. They also provided the offshore execution of the wind shroud replacement and flare tip maintenance works. Maintenance activities during a shutdown are always critical and need to be well prepared and effectively managed on a day-to-day basis.

Again, Conbit’s extensive experience with these projects contributed to the successful execution, done safely and on schedule.


See how we got to work

Flare tip wind shroud replacement - CKP Platform
Flare tip wind shroud replacement - CKP Platform
Flare tip wind shroud replacement - CKP Platform
Flare tip wind shroud replacement - CKP Platform
Flare tip wind shroud replacement - CKP Platform

PRoject case study pdf

Download the PDF of this project case study here.

Thanks for leaving your email address. You can now download the requested case study

Download Case study
Oops! Something went wrong while submitting the form.
No items found.

Whitepaper

Download our whitepaper of this case.

Download whitepaper

Related Cases

Related Services

Maritime
Wind
Oil & Gas

Inspections

Onshore & Offshore
Oil & Gas
Petrochemical
Wind

Modification

Onshore & Offshore
Oil & Gas
Petrochemical
Wind

Maintenance

Onshore & Offshore
Oil & Gas
Wind
Petrochemical
Maritime

Installation

Onshore & Offshore
Oil & Gas
Petrochemical

Decommissioning

Onshore & Offshore

Contact

We're here to answer your questions

Do you have any technical questions, general enquiries or do you need additional information? Don’t hesitate to contact our experts. With their expertise and experience in lifting services, they will gladly help you.

You can contact us by phone or email. We’re looking forward to your questions!
Jeremie Rotier

Jeremie Rotier

Sales Manager Asia-Pacific